Connect my devices Connect existing sensors and monitoring instruments to the platform, starting with real data.
Prepare manufacturer details, model, protocol, or sample messages Agent-assisted parsing and mapping of measurement items Verify the Data, Then Start Continuous Collection What to Prepare in Advance Device models, communication methods, protocol documentation, or actual messages
Book a Demo of This Capability Migrate a project Retain project experience and assess the smooth migration of devices and historical data to the new platform.
Organize Authorized Project and Data Exports Map measurement points, reference datums, units, and historical records Start with samples and parallel validation, then plan the switch What to Prepare in Advance Existing project structure, measurement point list, and historical data samples
Book a Demo of This Capability Create a project Choose an industry template to set up projects, monitoring parameters, measurement points, and demo data.
Describe the industry, monitored objects, and project conditions Generate draft monitoring parameters, measurement points, and configurations Connect devices, alerts, and reports after confirmation What to Prepare in Advance Project overview, monitored objects, and existing measurement-point layout data
Book a Demo of This Capability Draft a monitoring plan Combine industry knowledge with actual project materials to collaboratively draft a solution that can be revised repeatedly.
Add project conditions, drawings, and requirements Assist with drafting the basis, selecting equipment, determining measurement-point layouts, and designing networks Refine through multiple iterations, with professional review and final approval What to Prepare in Advance Project overview, design or site materials, and monitoring requirements
Book a Demo of This Capability You can prepare equipment, data, or sample reports in advance to verify compatibility during the demonstration. Monitoring plans, early-warning thresholds, and analysis results must be checked against actual project conditions before use.