FORMWORK & STRUCTURES / MONITORING

Detect changes in structural loading sooner with monitoring.

For high formwork and shoring systems and building structures, connect data on vertical-member axial force, formwork settlement, horizontal displacement, tilt, and vibration to help track the concrete-pouring load process and structural changes.

Shoring Post Axial Force Formwork settlement Horizontal Displacement Structural tilt
Discuss My Monitoring Plan
Illustration of monitoring applications for high formwork/shoring and building structures
AI-generated industry scenario illustration · Not an actual customer case
Bring the High Formwork and Building Structures Solution into Your Monitoring Project
Create Project Draft a monitoring plan
Understand the Field

First understand the site,
then organize monitoring data.

High formwork and shoring monitoring focuses on short-term changes during concrete pouring, while building structures require longer-term trend records. Monitoring must be combined with structural zones and actual operating conditions to clearly distinguish data anomalies, equipment faults, and structural responses.

WHAT TO MONITOR

What to measure, how to connect, and how to analyze it.

Core Monitoring Content Instruments and Data Sources Platform Analytics and Applications
Strut axial force and loading Axial-force sensors, pressure sensors, and strain gauges

Associate support layouts and concrete placement areas to observe the loading response.

Settlement and Horizontal Displacement Displacement sensors, total stations, hydrostatic leveling instruments

Track cumulative values and rates of change at key milestones.

Tilt and orientation Inclinometers, accelerometers

Identify changes in orientation and cross-check against other monitoring parameters.

On-Site Alerts and Linkage Audible and visual alarms, cameras, and data acquisition gateways

Send notifications and coordinate on-site actions according to the confirmed alert rules.

Integrate sensors, monitoring instruments, and gateways from various manufacturers. Verify the device model, accuracy, protocol, and actual adaptation scope during the solution phase.

FROM SETUP TO DELIVERY

Keep monitoring projects running through professional workflows.

01

Set up projects by shoring zone and structural node

02

Jointly commission acquisition frequency, alarm devices, and offline detection

03

Record key conditions such as concrete placement and loading

04

Aggregate monitoring data, anomaly reviews, and phase reports

DELIVERABLES THAT MATTER

See the process clearly,
and deliver results.

Support Zoning and Measurement-Point Layout Drawing
Force and Deformation Curves During Concrete Placement
Tiered alerts and notification response records
Building structure settlement and tilt report
Technical Basis and Project Applicability Follow the project-specific construction plan, monitoring plan, and applicable standards for formwork shoring and structural monitoring. The monitoring platform provides data and alert support; the project team must define engineering management procedures, on-site response authority, and responsibilities.

International projects must determine monitoring plans based on the laws, standards, and owner requirements of the project location. The Chinese standards mentioned on this page are provided only to illustrate relevant engineering scenarios and do not represent direct applicability in other countries or regions.

QUESTIONS, ANSWERED

Common Issues with High Formwork and Building Structures

Let's work through your questions, from integration to delivery.

Discuss Project Requirements
Does it include construction project management?

The platform focuses on monitoring projects, monitoring parameters and measurement points, data, devices, early warnings, and reports. Construction management tasks such as scheduling, materials, and labor are outside the platform's core scope.

Can it connect to on-site audible and visual alarms?

Alarm devices with compatible communication or control interfaces can be integrated. Protocols, power supply, network connectivity, and control permissions must first be confirmed, followed by on-site alarm linkage testing.

LET’S BUILD WHAT’S NEXT

Turn your site requirements, into a monitoring project that can be implemented.

Starting with the monitoring items, equipment, and delivery objectives for high formwork and building structures, we work together to make the solution concrete.

Let's Discuss My Project